South Campus Dexcom Factory 3, Penang
Introduction
The Challenge
Environmental & Industrial Wear
Constructing a high-tech medical device manufacturing plant like Dexcom Factory 3 requires infrastructure built to the highest global standards. Located in a coastal, high-humidity region of Penang, the facility's foundational elements and industrial pipework are constantly exposed to severe moisture and potential chemical stressors. The project required a robust, long-lasting barrier system to prevent corrosion and structural degradation without disrupting the facility's stringent operational construction timeline.
The Solution
Precision PGC Wraparound
To meet the aggressive environmental demands of the South Campus, our PGC Wraparound system was selected as the primary defense layer.
- Seamless Barrier Protection: The polymer wraparound was installed to create a heavy-duty, impermeable seal, completely isolating the underlying structural assets from water ingress, oxidation, and coastal salinity.
- High-Adhesion & Durability: Engineered to withstand harsh industrial conditions, the polymer solution provides a flexible, chemical-resistant layer that adapts to temperature fluctuations without cracking, peeling, or losing structural adhesion.
- Efficient Deployment: The wraparound system allowed for rapid, secure installation, ensuring the broader construction schedule for Factory 3 remained strictly on track.
The Result
Engineered for Longevity
The application of the PGC Wraparound successfully future-proofed the treated infrastructure at the Dexcom Factory 3 South Campus. By neutralizing the threat of environmental corrosion, our polymer solution significantly extends the lifespan of the facility's critical assets. The plant now operates with an enhanced structural safety margin, drastically reducing the risk of premature failure and minimizing long-term maintenance costs.
Client
South Campus Dexcom
Factory 3
Date
Completed
Categories
Earthwork & PEC Wall
Location
Penang



